Japan asbestos rules: what to check before work
Do not compress every requirement into one yes-or-no threshold. Survey, qualifications, reporting, notice, display, records and local procedures are separate checks.
Pre-work survey
Check whether the planned demolition or renovation affects existing material. Project size alone is not a general exemption from the survey question.
Qualified person
Qualification depends on the asset and applicable date. Building, work-structure and steel-vessel routes should be matched to the official Japanese scope tables.
Reports and notices
Government survey-result reporting and a 14-day notice are different procedures with different triggers and responsible parties. Confirm both, plus local requirements.
- 80 m² demolition-area route
- ¥1 million tax-inclusive contract-basis route
- 20 gross-ton steel-vessel route
- Material/work-specific advance notice